The Successful Bidder of this lot will be required to sign and date a Medical Statement of Intent and send to [email protected] prior to remitting full payment and initiating removal.
Overview
(1) Carl Zeiss Cirrus 5000 HD-OCT system. The system is classified in repairable condition. The unit appears complete and includes the OCT imaging head, integrated patient chin rest assembly under protective wrap, monitor and keyboard, system cabling, and a height-adjustable rolling instrument table. The system shows signs of storage and operational status has not been tested.
Specifications
- Manufacturer: Carl Zeiss Meditec Inc
- Model: Cirrus 5000 HD OCT
- Serial Number: 5000-5007
- Equipment Type: Optical Coherence Tomography (OCT) System
- Category: Scanning Systems: Laser
- Acquisition Date: November 19, 2014
- Life Expectancy: 10 years
Key Features
- High-resolution spectral-domain OCT system designed for retinal, macular, and optic nerve imaging.
- Standard model capability of 27,000+ A-scans per second.
- Designed for cube scans, line scans, and RNFL analysis functionality.
- Compatible with Zeiss FORUM software platforms.
- Includes OCT scanning head with infrared alignment camera and patient fixation target.
- Features motorized chin rest and touch-panel interface capabilities.
- Equipped with USB/serial data connections.
Condition & Markings
- This lot is in repairable condition. Parts may be missing, and repairs may be required.
- System is wrapped in protective material and shows signs of storage.
- Operational status has not been tested.
- Software presence and version on this unit is not verified.
- Unit may require software reinstallation, PC replacement, camera alignment, calibration, or optical components before imaging use.
- Only the items visible in the images are included.
Inspection and Removal
- Inspection and Removal: Available Monday through Friday, by confirmed appointment only. The site is closed on federal holidays. Contact the property custodian (listed below) to schedule an appointment.
- Property Inspection: Bidders are strongly encouraged to inspect the property prior to placing a bid to evaluate its condition and suitability. By bidding without an inspection, bidders assume the risk of potential omissions in the description.
- Removal Responsibilities: The successful bidder is solely responsible for all aspects of removal, including packing, crating, banding, loading, and shipping. The agency will not provide assistance.
- Authorized Third-Party Removal: The authorized third-party agent must present a Letter of Authorization from the high bidder (see terms and conditions for details), a copy of the purchaser's receipt, and a valid photo ID at the time of removal.
Disclaimer
- The condition of the property is not warranted. Pictures are not warranted.
Inspection: Please contact the property custodian for appointments/removals. If you are the successful bidder, property must be paid for within 2 business days and property removed within 10 business days from the time and date of the award e-mail notification of sale results, unless otherwise specified in the contract.